LNWR’s Cambridge Depot is suited to most forms of traction and rolling stock including freight vehicles for light maintenance and overnight servicing.
Current LNWR capabilities at Cambridge
include:
- 15 vehicle maintenance shed with side pit facilities
- 2 vehicle pitted maintenance shed capable of housing jacking and crane facility for most vehicle types
- External fuelling, CET (Controlled Emission Toilet) and wash-plant facilities
- Access to Network Rail infrastructure WAML (West Anglia Main Line)
|
|